News and History Access Catalog Color home Caroling Lookout Trips Access - maps Access: Site map pad


Wholeo 2024 icon Wholeo Rising - Installing Glass Panels on the Tube Frame

On site: Fall 2024 Marilyn Harris sends updates 

Marilyn Harris assembles a crew who learn how to attach glass panels to a framework while wrapping them with wide leads. It is like building a giant lampshade.

  First set of panels installed on frame. 8/12/24  Second set of panels installed on frame. 8/19/24  3rd set of panels installed on frame. 8-26-24 

 7th set of panels installed on frame. 9-17-24


More to come.

Back to Wholeo Rising

Wholeo Dome link See Wholeo Dome links.

Quick Search


Search WWW or : Search wholeo.net

Google

{Back to top of page}

{Wholeo Online} ~ {Trips} ~ {Wholeo} ~ {Glass dome} ~ {Glass dome location} ~ {Wholeo Rising}


© Copyright 2024 Caroling. All rights reserved. Date created: 2024-10-04 Last modified: 2024-10-08